BDC Group Inc. helped relocate a precast concrete shelter and generator, including full turn-key construction site preparation. The scope of work included the relocation of a new 12’x24’x10′ precast concrete shelter, 50 KW diesel generator and civil construction consisting of grading, concrete, grounding, craning, fence and rock.